Search

Did you mean :

FIRST PHASE OF WORK AT SPA-FRANCORCHAMPS GETS UNDERWAY

infrastructure for spectators is also being renovated. Several grandstands are to be refurbished, and a new covered grandstand with 4,600 seats will be built facing the Raidillon, offering a sweeping view as far as La Source. The EWC 24H Spa Motos is

#workingprogress

be erected at the top of Raidillon for the end of April, comprising 4,600 places and VIP boxes. La Chicane (Turn 18 & 19) Part of the run-off will make way for a gravel trap Double Gauche (Turn 10 & 11) Part of the tarmac run-off will be transformed

Investing for the future: first phase of work in relation to the return of the EWC 24H SPA MOTOS international competition"

a grandstand: the Raidillon. It will include almost 4,600 seats with a panoramic view from all parts of the grandstand over Source, the Endurance area and Raidillon 5 boxes will be installed over the entire length of the grandstand for a total

Inauguration of the new infrastructure of the Circuit of Spa-Francorchamps

24H SPA EWC Motos. There was also a desire to improve reception infrastructure for the general public with construction in the first phase of a new 4,600- seater grandstand located at the top of the Raidillon. This inauguration took place in the

2022, a season turned to the future, both on and off the track

’s Corner) and construction of a brand-new grandstand at the top of the Raidillon : 4,600 places, reception areas and a breathtaking view. It will be accessible to the public for the World Endurance Championship at the beginning of May. In the Endurance area