Did you mean :
Spark E#Day, a real success
the heart of these major changes. This is a real challenge facing society today and we wish to play our part in this development. The Circuit has already instigated a genuine digital (r)evolution to become 100% connected: installation of dark fibre
The Circuit of Spa-Francorchamps granted 3-star certification by the FIA
environmental safety projects have been completed: finalisation of the Circuit’s sewage/drainage system, the installation of hydrocarbon separators, the channelling of some sections of watercourses present on the site, making anti-leak devices available... winterised its buildings, installed presence sensors and continued with the installation of LED lighting. These measures meant that there was a decrease in consumption of 115,000 kWh in less than three months. In addition to the ban on using
The Circuit of Spa-Francorchamps is offering free WiFi connection and an even better App to the public
enabling: The installation of new cameras and strengthening of track safety and security An improved service for organisers, promoters, and others for televised reception andrecording High-performing WiFi for professional connections (promoters
#workingprogress
June 2022, the FIM grade C official approval is required. The works essentially have to do with the expansion of run-off areas and the installation of gravel trap. The infrastructure: The Circuit's infrastructure is ageing. Thus, it has been decided
MissionH24 running at the TotalEnergies 6 Hours of Spa-Francorchamps
, at the same time organizing a demonstration and hydrogen refueling of the first hydrogen electric laboratory vehicle, the LMPH2G. The challenge then began. The following years saw the installation of the first H2 mobile station, built by TotalEnergies